03 framesView
From line to steel: structural steel in Serik, Antalya
From stair towers to sea piers, we solve steel structures on paper, build them in the workshop and raise them on site by crane.
(01) About
Heavy work at its plainest: true measurements, clean welds, erection on time. Steel that leaves our yard in Serik stands on building façades, over the sea and across industrial sites.
- Base
- Serik, Antalya
- Scope
- Design → Fabrication → Erection
- Crew
- Our own fabrication and site team
(02) Selected work 09
Work that stands.
Each one drawn to its own measurements, built in the workshop and raised on site. Tap a project to open every frame.
Moves as you scroll

07 framesView

05 framesView

05 framesView

04 framesView

10 framesView

03 framesView

05 framesView

03 framesView
(03) Sea pier substructure, during installation.
(04) Services
Design to erection, one contact.
The same team draws, builds and installs every steel job. Responsibility stays in one place and nothing is left half done.
-
01
Steel buildings
Load-bearing steel for warehouses, hangars, workshops and commercial buildings.

-
02
Stairs & fire escapes
External escape stairs, stair towers, landings and railings.

-
03
Platforms & mezzanines
Generator, plant and storage platforms; steel mezzanine floors.

-
04
Piers & coastal structures
Substructures over water, pier frames and beach structures.

-
05
Pergolas & canopies
Steel pergolas, canopies and shelters for outdoor spaces.

-
06
Façades & railings
Lamella screens, stair-tower cladding, railings and parapets.

-
07
Roofing & cladding
Tiled roofs, sheet and panel cladding, roof framing.

-
08
Engineering
Structural design from site measurements, 3D models and shop drawings.

-
09
Transport & crane erection
Delivering finished parts to site and planned crane installation.

(05) Process
From line to steel in five steps.
-
Step 01
Survey & design
We measure on site and work out the structure and the 3D model. Shop drawings come from that model.

-
Step 02
Fabrication
Sections are cut, welded and primed. Parts leave the workshop ready to fit.

-
Step 03
Transport
Long sections and finished modules travel to site on our own vehicles.

-
Step 04
Erection
Modules are craned into place, bolted and welded.

-
Step 05
Handover
After final checks and clean-up, the job is handed over ready to use.

(06) Site diary
While the crew works.
- HEA
- IPE
- UPN
- Angle
- Box section
- Steel pipe
- S235 plate
- Lamella

(07) Company
Few words, much craft.
Türkmenoğlu Metal Çelik takes on steel buildings, stairs, platforms, piers, pergolas and façades with its own team based in Serik.
We settle the job on paper first, build it right in the workshop, then raise it safely on site. Our crew and vehicles carry our logo, and we stay with every job from start to finish.
- Company
- Türkmenoğlu Metal Çelik Ltd. Şti.
- Base
- Serik, Antalya, Türkiye
- Phone
- +90 545 672 17 64
(08) Contact
Let's talk steel.
A drawing, a photo or just a rough idea: send whatever you have and we will get back to you about a site visit and a quote.
Phone
0545 672 17 64 Message on WhatsAppLocation
Serik, Antalya Open in Maps ↗